DPP4.0 · For Equipment Manufacturers

Your Digital
Product Pass.

Easy & efficient, done in a flash.

Many manufacturers know: the DPP is coming. But effort, cost and complexity scare them off. Codewerk has an answer: a clear three-phase model that meets you where you are today – and brings you into production step by step.

Phase 1

Concept

  • Requirements clarification
  • On-site workshop
  • AAS modelling
  • SW architecture

Phase 2

Realisation

  • Implementation of concept
  • System integrations
  • Portal & user management
  • Always in close collaboration

Phase 3

Test & Go-Live

  • Functional & performance testing
  • Integration of existing devices
  • Go-Live

Common Concerns

What’s been holding manufacturers back – and why it no longer needs to.

We know the objections. That’s why we shaped our platform and our approach around them.

“This is way too complex – AAS, IDTA, IEC 61406…”

Codewerk handles the technical complexity end-to-end. You describe your product – we build the standard-compliant AAS. No AAS expertise required.

“We have no time for another IT project.”

Our three-phase model starts small: Phase 1 requires only a few hours of your resources and already delivers usable results.

“The budget feels open-ended – this will get expensive.”

Every phase has a fixed scope and budget. No surprises. You decide at the end of each phase whether to continue.

“Our data lives in different systems.”

unibeam connectors link ERP, MES, databases and CSV exports. No IT overhaul needed – we pick the data up where it sits.

“We have no digital team for this.”

We deliver turnkey. Your team needs no development know-how – just product knowledge and contacts for technical questions.

“The DPP isn’t mandatory yet – why now?”

From 2027, the first mandatory DPPs arrive. Early movers build experience and can stand out as suppliers before the pressure hits.

Our Project Model

Your DPP in three clearly defined phases

Each phase has a concrete deliverable. You stay in control – and decide at the end of each phase how to proceed.

Phase 1

Concept Phase

We understand your product, your data and your goals – and develop a clear technical blueprint.

RESULT

Technical concept & roadmap

Phase 2

Realisation Phase

The concept becomes a running system – always in close collaboration with you.

RESULT

Running DPP system

Phase 3

Test & Go-Live

Everything gets tested, existing devices are integrated – then your DPP goes live.

RESULT

Productive DPP in operation

Get Started

Easy entry – today.

1
Create a free account
Takes two minutes, no credit card, no contract.
2
Photograph the nameplate
Point the camera at your device’s nameplate. The Asset Creator’s AI automatically extracts all relevant fields.
3
AAS is generated automatically
Add documents, images and technical data – done. The Asset Administration Shell and the ID link are created automatically.
4
Share or export the DPP
Print the QR code, download the AASX package, or expose the AAS API for your customers.
Go to the DPP Platform

Why Codewerk

Technology expertise you don’t have to build yourself.

Codewerk has been a software service provider for industry for more than ten years – with deep understanding of product data, IT systems and industrial standards.

IDTA Member since 2021

We actively shape the AAS standard and know the submodels first-hand.

Factory-X Consortium

Participant in the Hannover Messe demonstrator – proven in practice with real industrial partners.

From embedded to cloud

We understand industrial IT – from controller code to cloud platform. No ivory-tower consulting.

> 90 experts

Direct contacts, short paths. No anonymous ticket system – one team that knows your products.

Reference Project · Already live

Michael Koch GmbH

» Digital nameplate for braking-energy recuperation – standard-compliant and populated directly from the production system. «

Michael Koch GmbH · typeplate.bremsenergie.de

What was implemented

  • Digital nameplate to IDTA standard
  • Drupal connector to the existing website database
  • CSV connector for production data
  • Automatic ID-link generation per device
  • QR-code-based access to the DPP

EU Regulation

From 2027 the DPP becomes mandatory. Now is the right moment.

The EU Ecodesign for Sustainable Products Regulation (ESPR) gradually mandates the Digital Product Pass for more and more product groups. Early movers are prepared.

2023
Battery regulation & DPP framework laws
July 2024
ESPR comes into force
2025–2026 · NOW
ESPR work plan · DPP vendor consolidation
From 2027
First mandatory DPPs
2030+
Expansion to further product groups
PROMOTIONAL PERIOD · ORDER BY December 31, 2026

The Offer: Concept, free implementation, hosting.

The DPP becomes mandatory from February 2027. Start now – the complete implementation during the promotional period is free.

01 · CONCEPT PHASE
5.000 €
one-time

Requirements clarification, on-site workshop, AAS modelling and the technical blueprint for your project.

Fixed scope, fixed price – you decide afterwards whether to continue.

03 · HOSTING
3.999 €
month from go-live

Secure operation of your DPP platform incl. maintenance and updates. Minimum term of 4 years.

After the first 4 years, a price adjustment of up to 5 % per year is reserved.

Ready to start your first DPP?

One conversation is enough – together we’ll clarify what product data you have and what Phase 1 means for you concretely. No long pitch, no commitment.

Free implementation applies to connecting up to 2 systems via file-based interfaces (CSV, XML) or standard database interfaces (SQL). Additional systems or interface types are calculated separately.